The tables below summarize the reported resources at the Hope Bay Project as at December 31, 2006

HOPE BAY INDICATED MINERAL RESOURCES AT DECEMBER 31, 2006


Area/Deposit/Zone

Indicated
Tonnes         g Au/t

Cut-off

Contained

 

g Au/t

Ounces Au

Madrid Deposits

 

 

 

 

Naartok East

11,353,900

3.7

1.5

1,350,727

Naartok West

6,794,400

3.7

1.5

797,672

Rand

2,957,000

2.5

1.5

239,910

Suluk

11,427,700

3.6

1.5

1,313,989

South Patch

0

0.0

0.0

0

Subtotal Madrid

32,533,000

3.5

 

3,702,298

Doris Deposits

 

 

 

 

Doris Hinge(2)

345,000

34.7

8.0

385,000

Doris North/Connector

n/a

 

 

 

Doris Central

824,000

12.9

5.0

341,000

Doris Pillars

n/a

n/a

0.0

N/A

Subtotal Doris

1,169,000

19.3

 

726,000

Boston Deposits

 

 

 

 

Boston B2

1,949,000

11.4

4.0

713,000

Boston B3/B4

363,000

7.3

4.0

85,000

Subtotal Boston

2,312,000

10.7

 

798,000

Total Inferred (3)

36,014,000

4.51

 

5,226,298

  1. Disclosure of contained ounces is permitted under Canadian regulations; however, the United States Securities and Exchange Commission generally permits mineralization that does not constitute "reserves" to be reported only as in place tonnage and grade.
  2. Includes the undiluted, unrecovered Probable Mineral Reserve for Doris Hinge referred to below.
  3. Numbers may not add up exactly due to rounding.
HOPE BAY INFERRED MINERAL RESOURCES AT DECEMBER 31, 2006

Area/Deposit/Zone

Inferred
Tonnes                   g Au/t

Cut-off

Contained

 

g Au/t

Ounces Au

Madrid Deposits

 

 

 

 

Naartok East

14,368,900

2.8

1.5

1,274,903

Naartok West

5,228,100

3.4

1.5

565,276

Rand

5,373,600

2.3

1.5

403,284

Suluk

17,342,000

2.8

1.5

1,546,437

South Patch

227,000

22.5

7.0

164,202

Subtotal Madrid

42,539,600

2.9

 

3,954,102

Doris Deposits

 

 

 

 

Doris Hinge

28,000

10.0

8.0

9,000

Doris North/Connector

1,270,000

13.9

5.0

569,000

Doris Central

73,000

12.8

5.0

30,000

Doris Pillars

263,000

18.6

5-7

158,000

Subtotal Doris

1,634,000

14.5

 

766,000

Boston Deposits

 

 

 

 

Boston B2

995,000

9.1

4.0

292,000

Boston B3/B4

1,437,000

9.7

4.0

449,000

Subtotal Boston

2,431,000

9.5

 

741,000

Total Inferred (3,4)

46,604,600

3.64

 

5,461,102

  1. Disclosure of contained ounces is permitted under Canadian regulations; however, the United States Securities and Exchange Commission generally permits mineralization that does not constitute "reserves" to be reported only as in place tonnage and grade. See discussion in the section on Forward Looking Statements for a description of differences between Canadian and U.S. estimate of mineral resources.
  2. Inferred Mineral Resources are reported in addition to Indicated Mineral Resources.
  3. Numbers may not add up exactly due to rounding.
Quality Assurance

All resource and reserve estimates have been prepared by the Miramar Hope Bay Limited staff and directly employed consultants in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by John Wakeford, P. Geo. Vice President, Exploration, for Miramar Mining Corporation. All resource models were estimated utilizing three dimensional block model methods, except for the South Suluk and South Patch 14 areas, which were estimated utilizing a two dimensional polygonal approach. In 2006 new resource models were created for Madrid to incorporate new drilling. All previous resource estimates and models are unchanged from 2004. All deposits have been subject to a capping exercise whereby capping grades were applied as determined by geostatistical analysis. Also, cut-off grades were used for all deposits and vary according to deposit size, grade and geometry. The resource estimates for the Doris group of deposits, South Patch 14 and the main portion of the Boston deposit have utilized a cut-off grade from 4.0 to 8.0 g/t gold based on the assumption that possible extraction would likely be by underground methods. The remaining Madrid group of deposits, Naartok, Rand and Suluk were modelled utilizing a lower grade cut-off of 1.5 on the assumption that likely extraction would be by open pit methods. The Madrid area deposits are presented at a range of cut-off grades with a 1.5 g/t gold cut-off used for the Resource Summary table above.

Indicated resources generally lie within 25 metres of a drill hole within detail drilled areas and inferred resources generally lie no more than 50 metres from a drill hole except for a portion of the thicker zones at Naartok have been extended up to 100m where geological confidence can been displayed. The resource estimates for the Madrid were prepared by Miramar Hope Bay Limited staff and independent consultants, and reviewed by John Wakeford P. Geo., Vice President and Qualified Person for Miramar Mining Corporation as defined in NI 43-101.

Included within the above numbers are approximately 158,000 ounces at 18.6g/t of gold that are included in possible mine pillars at Doris. Pillars lie within 30 m of lake bottoms (Pillars) and are unlikely to be mined without significant economic and permitting challenges. The regulations for pillars under lakes in Nunavut require the Mines Inspection Branch to provide a variance for mining within 100m of a lake bottom. There can be no certainty that such a variance will be granted.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these inferred resources will be converted to measured and indicated categories through further drilling, or into mineral reserves once economic considerations are applied.

 

Adnet Communications Inc. Adnet Communications Inc.